We completed design checks on a 60m high double mast climber used as an access solution for the demolition of an industrial chimney structure in Warrington, UK. The twin mast climbers were designed to support an adjustable access platform to safely carry the weight of 3 workers and a demolition robot. The height, the external […]

Forth Road Bridge

AWD was appointed to design an access scaffold for the improvement works on the Forth Road Bridge for our client Taziker Industrial Ltd. The project saw our access scaffold installed on the underdeck of the bridge, to support the upgrading of the steel walkways beneath the north side span of the bridge. Designed using standard […]

Center Parcs Longleat Dome

Design of an award-winning tiered suspended access platform at Center Parcs, Longleat. PROJECT We designed an award-winning suspended access platform for our client iMS Access Ltd to give workers access to repair the 100m diameter domed roof at Center Parcs in Longleat. The project required that the centre remain fully open to the public during […]

PD Ports Jetty

AWD used NDN non-linear finite element software to develop and design a cable supported catenary wire access platform used to access the underside of a jetty for PD Ports for maintenance and repair work. Our experienced structural designers created a perforated access system to allow the platform to be submerged and functional effectively at high […]

Hunterston Power Station

AWD designed a triple-deck suspended access platform used to install a protective membrane around the reactor building at Hunterston to prevent water ingress during the decommissioning of the nuclear power station. The bottom deck was composed of a Technitruss modular space frame, designed to conform to the shape of the building. The space frame, upper […]