Hercules House, London
AWD designed a broad temporary works package for the refurbishment of Hercules House in London, by Park Plaza Hotels.
Our temporary works designs included substantial core removal bracing to provide global stability to the former office building while the permanent concrete cores of the building were removed.
Additional temporary works designs were required for tower crane bases and sheet piling was utilised to stabilise ground conditions. All of these elements were linked by scaffold bridges which we designed to ensure safe and easy access in and around the site for all workers.